Following the training and consultancy delivered to Şensac Yassı Metal San. Tic. A.Ş. by OzUBEX under the Learn & Transform Programme, real-time data collection, accurate OEE measurement and automated alert systems were implemented on the pilot production line. Coil changeover times fell from 20–25 minutes to 7–13 minutes, while size changeover times also improved. It also became possible to identify the most suitable production line and speed for approximately 2,000 different products using data-driven analysis.
“Coil changeover times dropped from 20–25 minutes to 7–13 minutes, reaching global standards. Size changeover times also decreased from 50 minutes to 35–40 minutes. We can now determine the most suitable production speed and line for each product and plan our production strategy based on data. The OzUBEX team approached us as a solution partner rather than simply a consultant.”
Company Testimonial — Şensac Yassı Metal San. Tic. A.Ş.